Full-moon & event summits 2026–2028 · join a group departure →
Trek Up Kilimanjaro
Climbers ascending with the Kibo peak behind them

Rongai Route

The only approach from the north, the driest option in the wetter months, and consistently the quietest of the mainstream routes.

In short

Rongai climbs the northern side near the Kenyan border, through terrain that is drier and more open than the southern rainforest, before joining the Marangu descent.

What it does well

  • The northern side sits in a rain shadow, so it stays drier when the south is wet.
  • Far fewer climbers than the southern routes.
  • A gentler, more consistent gradient on the way up.
  • The optional Mawenzi Tarn detour is one of the finest camps on the mountain.

What to weigh up

  • A long transfer around the mountain to reach the trailhead.
  • Less varied scenery than Lemosho or Machame on the ascent.
  • Fewer natural climb-high-sleep-low opportunities, so the itinerary length matters more.

Route facts

7 days
Recommended length
73 km
Total distance
5,895 m
Highest point
North
Approach side
Marangu
Descent route
Camping
Sleeping
Moderately challenging
Difficulty
Jan · Feb · Mar · Jun · Jul · Aug · Sep · Oct · Nov
Best months

The altitude profile

Circles mark sleeping altitudes. Those are what your body adapts to — the high points you walk over during the day matter far less.

Rongai Route elevation profile Route Sleeping altitude
Rongai Route elevation profile. Full data is given in the table below. 2,000 m 3,000 m 4,000 m 5,000 m 6,000 m Simba Camp 2,625 SecondCave 3,450 KikelewaCamp 3,600 MawenziTarn 4,330 Kibo Hut 4,700 Uhuru Peak 5,895 HoromboHut 3,720
Rongai Route elevation profile
Day Location Altitude (m) Distance (km) Overnight
1 Rongai Gate 1,950 0 No
1 Simba Camp 2,625 8 Yes
2 Second Cave 3,450 14 Yes
3 Kikelewa Camp 3,600 20 Yes
4 Mawenzi Tarn 4,330 25 Yes
5 Kibo Hut 4,700 33 Yes
6 Uhuru Peak 5,895 43 No
6 Horombo Hut 3,720 53 Yes
7 Marangu Gate 1,860 73 No

The route, camp by camp

As walked on our 7 Days Rongai Route itinerary, with the altitudes it gives.

N Mawenzi Nalemuru Gate1,950 m Simba Camp2,625 m Second Cave Camp3,450 m Kikelewa Caves3,600 m Mawenzi Tarn Camp4,330 m Kibo Hut4,700 m Uhuru Peak5,895 m Horombo Hut3,720 m Marangu Gate1,860 m
Ascent Descent Overnight camp Schematic map, not to scale: positions are approximate and not for navigation. Altitudes are from our itineraries. Terrain: SRTM (NASA), via Terrain Tiles on AWS.
  1. 01 Nalemuru Gate gate 1,950 m
  2. 02 Simba Camp camp 2,625 m
  3. 03 Second Cave Camp camp 3,450 m
  4. 04 Kikelewa Caves camp 3,600 m
  5. 05 Mawenzi Tarn Camp camp 4,330 m
  6. 06 Kibo Hut hut 4,700 m
  7. 07 Uhuru Peak summit 5,895 m
  8. 08 Horombo Hut · descent hut 3,720 m
  9. 09 Marangu Gate · descent gate 1,860 m

Day by day

These are the days of our 7 Days Rongai Route.

01

Rongai Gate to Simba Camp

  • 1,950 m → 2,625 m
  • 8 km
  • 4–5 hrs
  • Forest / heath
↑ 675 m gained
Begin on the quieter northern side through cultivated land, forest and open heath.
From
Rongai Gate
To
Simba Camp
Sleeping altitude
2,625 m (8,612 ft)
02

Simba Camp to Second Cave

  • 2,625 m → 3,450 m
  • 6 km
  • 3–4 hrs
  • Heath
↑ 825 m gained
A steady climb with increasingly open views across the northern plains.
From
Simba Camp
To
Second Cave
Sleeping altitude
3,450 m (11,319 ft)
03

Second Cave to Kikelewa Camp

  • 3,450 m → 3,600 m
  • 6 km
  • 3–4 hrs
  • Moorland
↑ 150 m gained
Traverse southeast toward the jagged Mawenzi massif. The modest sleeping gain supports acclimatization.
From
Second Cave
To
Kikelewa Camp
Sleeping altitude
3,600 m (11,811 ft)
04

Kikelewa to Mawenzi Tarn

  • 3,600 m → 4,330 m
  • 5 km
  • 4–5 hrs
  • Alpine desert
↑ 730 m gained
Climb beneath Mawenzi’s dramatic spires to one of Kilimanjaro’s most striking camps. Optional acclimatization walk if appropriate.
From
Kikelewa
To
Mawenzi Tarn
Sleeping altitude
4,330 m (14,206 ft)
05

Mawenzi Tarn to Kibo Hut

  • 4,330 m → 4,700 m
  • 8 km
  • 5–6 hrs
  • Alpine desert
↑ 370 m gained
Cross the lunar Saddle between Mawenzi and Kibo to the final summit base.
From
Mawenzi Tarn
To
Kibo Hut
Sleeping altitude
4,700 m (15,420 ft)
06

Kibo Hut to Uhuru Peak to Horombo Hut

  • 4,700 m → 3,720 m
  • 20 km
  • 12–16 hrs
  • Arctic summit to moorland
↑ 1,195 m gained ↓ 2,175 m descended Sleeps 3,720 m
Climb via Gilman’s Point and the crater rim to Uhuru Peak, then make the long descent to Horombo Hut.
From
Kibo Hut
To
Horombo Hut
Sleeping altitude
3,720 m (12,205 ft)
Highest point
5,895 m
07

Horombo Hut to Marangu Gate

  • 3,720 m → 1,860 m
  • 20 km
  • 5–7 hrs
  • Moorland / rainforest
Descend through Mandara and forest to Marangu Gate, then transfer to Moshi.
From
Horombo Hut
To
Marangu Gate

What is and is not included

As listed on our 7 Days Rongai Route. What the crew does and what we carry is the same on every itinerary we run here. The number of nights is not, and park fees are charged per night, so each climb page carries its own list.

What is included

Transfers

  • Airport pick-up and drop-off - Kilimanjaro International Airport (JRO) to/from your hotel
  • Private transfers to/from the mountain gate - Hotel to Kilimanjaro trailhead and exit gate to hotel

Meals & water

  • Pre & post-climb accommodation - 2 nights in Moshi (1 night before and 1 night after the climb) on Bed & Breakfast basis
  • Three freshly prepared meals per day on the mountain - breakfast, lunch and dinner
  • Nutritious snacks during the trek
  • Clean, purified drinking water throughout the climb
  • Hot water for washing each morning and evening where practical

Permits & park fees

  • Kilimanjaro National Park entrance fees
  • Camping fees
  • All applicable government taxes & VAT
  • Kilimanjaro summit certificate for successful climbers

Safety equipment

  • Kilimanjaro National Park rescue fees
  • Emergency supplemental oxygen
  • Pulse oximeter for monitoring blood oxygen saturation and pulse during the climb
  • First-aid kit and mountain emergency equipment
  • Daily health monitoring by the mountain guide
  • 24/7 emergency communication support between the mountain team and operations office

Guides & crew

  • Professional, licensed English-speaking Kilimanjaro mountain guide
  • Assistant mountain guides - according to group size
  • Professional mountain chef/cook
  • Porters - to carry group equipment, food and clients permitted duffel luggage
  • All mountain crew wages and salaries
  • Cooking tent and complete camp equipment
  • Private portable flush/chemical toilet with dedicated toilet tent and porter - throughout the trek

Camping equipment

  • Quality four-season mountain tents
  • Comfortable sleeping mattresses
  • Dining/mess tent with tables and chairs

Also included

  • Pre-climb briefing and equipment check
  • All logistical and operational support throughout the expedition

What is not included

  • International and domestic flights
  • Tanzania entry visa
  • Travel and medical insurance - clients should have appropriate coverage for high-altitude trekking up to at least 6,000 metres
  • Helicopter/air evacuation or specialist medical evacuation unless specifically included by the client insurance policy
  • Personal trekking equipment and clothing, including hiking boots, sleeping bag, down jacket, trekking poles, daypack and other personal gear
  • Equipment rental, unless specifically included in the quotation
  • Tips/gratuities for mountain guides, assistant guides, cook and porters
  • Lunch and dinner at the hotel before or after the climb unless specified
  • Soft drinks, alcoholic beverages and bottled drinks outside those specifically included
  • Personal snacks and energy bars brought by the client
  • Laundry services
  • Telephone calls, SIM cards, internet/data charges and other communication expenses
  • Additional hotel nights or transfers caused by flight changes, early arrival or late departure
  • Single-room or single-tent supplement, where applicable
  • Extra porter required for luggage exceeding the permitted mountain weight
  • Personal expenses such as souvenirs and shopping
  • Any activities, accommodation, meals, transfers or services not specifically stated in the itinerary
  • Costs arising from itinerary changes requested by the client or circumstances outside the company control

What it costs

Our 7 Days Rongai Route, per climber. A smaller group pays more each because the crew, the vehicles and the camp cost the same however many of you there are.

Private climb prices by party size
Party size Per person
1 climber Private Solo Expedition — Maximum privacy. US$3,115
Scheduled group prices by party size
Party size Per person
2–4 climbers Small Group Rate — Shared value. US$2,870
5–7 climbers Group Discount Rate — Preferred group rate. US$2,625
8–10 climbers Best Group Rate — Best value per climber. US$2,450

Dates, group departures and the full price table

Who this route suits

A good fit for

  • Climbers travelling in the shoulder seasons
  • Trekkers who want a quieter trail
  • Those who prefer a steadier, less steep gradient

Probably not for

  • Climbers who want the most dramatic scenery
  • Anyone hoping for a rainforest-heavy trek

Itineraries on this route


Before you decide

At a glance

Acclimatisation 4/5
Trail traffic 4/5
Difficulty 3/5
Scenery 3/5